Integrated sewage treatment equipment/
ultrafiltration equipment/membrane
bioreactor/drinking water safety filtration

In environmental water treatment engineering, design is the core prerequisite for determining the success or failure of the project. Our company relies on a professional technical team and rich industry experience to build a full process design service system. If the customer has clear requirements, we will prioritize in-depth interpretation of the water quality report provided by the customer, starting from core indicators such as pollutant types, concentrations, and water flow rates, and combining them with national and local environmental emission standards to conduct data modeling and analysis, accurately identifying key control points. For projects that have not yet obtained detailed water quality data, we can dispatch a team of senior engineers to conduct on-site inspections to ensure that the design scheme is highly compatible with the actual working conditions. In the process analysis stage, we will compare the technical feasibility, economic cost, and operational stability of various mainstream water treatment processes. For example, for industrial wastewater, we will comprehensively evaluate the combination application schemes of biochemical treatment, membrane separation, advanced oxidation and other processes; For domestic sewage treatment, the process parameters for nitrogen and phosphorus removal will be optimized. The final design scheme formed.
View details

Equipment is the key carrier for achieving the effectiveness of water treatment processes. Our company adheres to the concept of "quality first, customized production" and has established a full chain quality control system from raw material procurement to factory commissioning to ensure that every equipment can operate stably. Before equipment production, the technical team will accurately locate the material, specifications, and structure of the equipment based on the process parameters in the design plan. Ensure stable process conditions. During the production process, we strictly adhere to the ISO9001 quality management system standard and establish multiple quality inspection nodes: raw materials entering the site must pass inspections such as material testing and strength testing; In the equipment processing stage, technicians will monitor the accuracy of components in real time to ensure that errors are controlled within the industry standard range; After the equipment is assembled, it will undergo airtightness testing, no-load operation testing, etc. to identify potential faults and hidden dangers. Before leaving the factory, all equipment must complete full condition simulation debugging, simulate the actual inlet water quality and flow rate of customers, test equipment processing efficiency, energy consumption, noise and other indicators to ensure that all parameters meet the standards.
View details

During the on-site installation phase, we will dispatch an experienced construction guidance team to develop a detailed installation and construction plan based on the project site layout and design specifications. Guidance personnel will supervise the entire construction process, including equipment placement, pipeline connections, and circuit wiring, to ensure that installation accuracy meets design requirements. For example, pipeline connections must be sealed and leak free, and circuit wiring must comply with safety regulations to avoid improper installation affecting equipment operation. After the equipment installation is completed, it enters the on-site debugging stage. Technicians will conduct debugging in stages: first, single machine debugging will be carried out to test the operating status of each device; Subsequently, linkage debugging was carried out to simulate the entire process of water treatment, gradually adjusting process parameters such as aeration air volume, dosage of chemicals, pump speed, etc., until the effluent quality stabilized and met the design standards. After the debugging is completed, we will provide customers with comprehensive technical training, covering equipment operating procedures, daily inspection points, common fault troubleshooting and handling, emergency plans, etc. The training adopts a "theoretical explanation+practical demonstration" approach to ensure that customer operation and maintenance personnel can proficiently operate equipment, such as teaching operators how to monitor water quality indicators through control systems, how to identify equipment abnormalities and perform simple repairs.
View details
Main product range: leachate treatment, kitchen wastewater treatment, industrial oily wastewater treatment, pharmaceutical wastewater treatment, food factory wastewater treatment, hardware surface wastewater treatment, zero discharge wastewater reuse, aquaculture and livestock wastewater treatment, medical wastewater treatment, cosmetics wastewater treatment, etc.
In the process of sewage treatment, it is advisable to design and treat according to the principle of energy conservation, avoid unnecessary energy consumption, optimize the treatment process, and greatly reduce energy consumption through reasonable structural construction and layout.
Add:No. 36, 2nd Floor Shop, Xingyu Mingdu, No. 89 Lishui Avenue North, Lishui Town, Nanhai District, Foshan City, China
+86-13826417062