During the on-site installation phase, we will dispatch an experienced construction guidance team to develop a detailed installation and construction plan based on the project site layout and design specifications. Guidance personnel will supervise the entire construction process, including equipment placement, pipeline connections, and circuit wiring, to ensure that installation accuracy meets design requirements. For example, pipeline connections must be sealed and leak free, and circuit wiring must comply with safety regulations to avoid improper installation affecting equipment operation. After the equipment installation is completed, it enters the on-site debugging stage. Technicians will conduct debugging in stages: first, single machine debugging will be carried out to test the operating status of each device; Subsequently, linkage debugging was carried out to simulate the entire process of water treatment, gradually adjusting process parameters such as aeration air volume, dosage of chemicals, pump speed, etc., until the effluent quality stabilized and met the design standards. After the debugging is completed, we will provide customers with comprehensive technical training, covering equipment operating procedures, daily inspection points, common fault troubleshooting and handling, emergency plans, etc. The training adopts a "theoretical explanation+practical demonstration" approach to ensure that customer operation and maintenance personnel can proficiently operate equipment, such as teaching operators how to monitor water quality indicators through control systems, how to identify equipment abnormalities and perform simple repairs.
Add:No. 36, 2nd Floor Shop, Xingyu Mingdu, No. 89 Lishui Avenue North, Lishui Town, Nanhai District, Foshan City, China
+86-13826417062